Powering Your EV Infrastructure
Professional liaison and engineering documentation support for dedicated EV charging connections, HT transformer sanctioning, and green meter processes across Maharashtra.
8-Stage Connection & Metering Sequence
Clear step-by-step guidance from initial registration to energized meter commissioning.
Customer Registration
Document Upload & Audit
Load Requirement Analysis
Application Form Filing
MSEDCL Coordination
Sanction & Estimate Payment
Meter & CT/PT Installation
Charger Commissioning
What Our Team Coordinates
Streamlining complex electrical regulatory and utility procedures.
Electrical Load Analysis
Calculating exact kW/kVA capacity required based on simultaneous charger ratings and diversity factors.
Documentation & Portal Filing
Preparing ownership proof, 7/12 extracts, NOCs, and single line diagrams (SLD) for DISCOM submission.
CEIG Electrical Inspector Clearances
Facilitating drawings approvals and statutory safety clearances for HT substations >650V.
Dedicated EV Tariff Categorization
Ensuring your connection benefits from state-notified special concessional EV charging tariff slabs.
Need Support for Grid Connection or Load Hike?
Contact our electrical compliance engineers to evaluate your sanctioned load and fast-track your EV application.