Power & Grid Liaison

Powering Your EV Infrastructure

Professional liaison and engineering documentation support for dedicated EV charging connections, HT transformer sanctioning, and green meter processes across Maharashtra.

Important Regulatory Notice"Amrut Bharat EV provides consultancy, documentation, and process-support services and is not itself a government department or MSEDCL unless officially authorized. All applications are filed through official DISCOM portals under the customer's legal entity."
Structured Process

8-Stage Connection & Metering Sequence

Clear step-by-step guidance from initial registration to energized meter commissioning.

STEP 01

Customer Registration

STEP 02

Document Upload & Audit

STEP 03

Load Requirement Analysis

STEP 04

Application Form Filing

STEP 05

MSEDCL Coordination

STEP 06

Sanction & Estimate Payment

STEP 07

Meter & CT/PT Installation

STEP 08

Charger Commissioning

Consultancy Inclusions

What Our Team Coordinates

Streamlining complex electrical regulatory and utility procedures.

Electrical Load Analysis

Calculating exact kW/kVA capacity required based on simultaneous charger ratings and diversity factors.

Documentation & Portal Filing

Preparing ownership proof, 7/12 extracts, NOCs, and single line diagrams (SLD) for DISCOM submission.

CEIG Electrical Inspector Clearances

Facilitating drawings approvals and statutory safety clearances for HT substations >650V.

Dedicated EV Tariff Categorization

Ensuring your connection benefits from state-notified special concessional EV charging tariff slabs.

Need Support for Grid Connection or Load Hike?

Contact our electrical compliance engineers to evaluate your sanctioned load and fast-track your EV application.