Turnkey Infrastructure Engineering

From Site Survey to Commissioning

Amrut Bharat EV delivers complete turnkey Engineering, Procurement, and Construction (EPC) services for high-capacity EV charging stations and fleet depots across Bharat.

13-Stage Methodology

Turnkey EPC Blueprint Timeline

Our structured engineering sequence ensures zero-defect commissioning and on-time delivery.

Turnkey Engineering Blueprint

The 13-Stage EPC Infrastructure Lifecycle

Standard Execution: 21 to 45 Days Turnaround
STAGE 01Engineering Standard

Site Survey & Geotech

Topographical mapping, parking layout feasibility & soil resistivity testing.

Comprehensive Engineering Scope

Complete In-House Capabilities

From high-voltage grid interconnection to final signage and brand commissioning.

Site Assessment & Feasibility Audits
Detailed Project Report (DPR) & Financial Modeling
HT Substation & Compact Transformer Design
Civil Foundation Plinths & Canopy Architecture
LT/HT Panel & Vacuum Circuit Breaker (VCB) Work
Armoured Copper/Aluminium Cable Laying & Trenching
Earthing & Lightning Protection Systems (IS 3043)
High-Power AC/DC EVSE Installation
Statutory DISCOM & CEIG Electrical Clearances
OCPP 2.0.1 Cloud CMS Integration & Testing

Plan Your Turnkey EV Charging Hub

Get an engineered site layout, electrical Single Line Diagram (SLD), and detailed BoQ estimate tailored to your land parcel.